720 KING ST W
Proposal for interior alterations to the existing public corridor to convert a portion of an existing storage room to a universal washroom.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for interior alterations to the existing public corridor to convert a portion of an existing storage room to a universal washroom.
HVAC - Proposal for interior alterations to the existing public corridor to convert a portion of an existing storage room to a universal washroom.
Plumbing - Proposal for interior alterations to the existing public corridor to convert a portion of an existing storage room to a universal washroom.
Proposed interior fit out for a barber shop. Paint, furniture, hvac system upgrade, minor electrical adjustments, minor plumbing adjustments.
Proposal for parking lot refurbishing and laneway improvements
PROPOSED: VOLUNTARY FIRE ALARM SYSTEM RETROFIT
Interior alterations to an existing Tim Hortons including plumbing, HVAC, structural and electrical work
Plumbing - Interior alterations to an existing Tim Hortons including plumbing, HVAC, structural and electrical work
REV01:CORRIDOR EXPANSION TO COMMON CORRIDOR DEMISING WALL
Proposal for interior alterations to the common corridor demising wall, existing stair vestibules, mechanical/electrical room vestibule in the existing office building.
Proposal to install 1 Electromagnetic Lock on the 12th floor of existing office building
REV01: Revision to issued permit 16-271241 BLD. Transformer vault decommissioning and new site furnishings.Proposal for transformer vault repair in an existing office building.
Proposal to supply and install a new AC unit system for the UPS Room for back up cooling - new refrigerant piping, condenser roof installation, x-ray and core, condensate drain.
Proposal to replace existing sprinkler heads in corridor on the 5th floor of existing office.
HVAC - Proposal for interior alterations to existing 8th floor corridor.
Proposal for interior alterations to existing 8th floor corridor.
Proposal for transformer vault repair in an existing office building.
HVAC - Proposal for transformer vault repair in an existing office building.
Plumbing - Proposal to construct interior alterations on the 7th floor of the existing office building.
Proposal to construct interior alterations on the 7th floor of the existing office building.
Page numbers are hidden until the total count is available from the data service.