1725 BATHURST ST
Revision 02 - Proposed revision exterior walls and foundation wall.-----------------------------------------------------------------------Rev 01- Proposed 4th, 5th & 6th storey addition, interior a…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 02 - Proposed revision exterior walls and foundation wall.-----------------------------------------------------------------------Rev 01- Proposed 4th, 5th & 6th storey addition, interior a…
Rev 01 - Dust collector workRemoval and replacement of school wood workshop dust collection system complete with installation of two indoor dust collectors on structural equipment pad and interlock…
Proposal for replacement of cabinet unit heaters, fan coil units, finned tube radiant heaters, etc. Supply and install new piping and associated accessories.
Deferred Fees from folder 24 136488 (RSN-5559920) ZoningProcess RSN 77194102
Rev 01- Proposed 4th, 5th & 6th storey addition, interior alterations and conversion to 10 units.
Proposed scope of work to include courtyard window replacement, courtyard brick repairs, and structural modifications to access platforms from courtyard.
The existing two storey five unit apartment building will remain. Third storey addition to accommodate three additional dwelling units. Total number of dwelling units is 8.Rev 01 - Proposed 4th, 5t…
PROPOSED: Removal and replacement of school wood workshop dust collection system complete with installation of two indoor dust collectors on structural equipment pad and interlocked with two new ma…
Plumbing - Proposal for interior alterations/ addition to roof to accommodate new elevator. Add a 5th unit in the basement of an existing detached dwelling with 4 units.22 234229 PLB - Proposal for…
Demolish existing steam boiler, terminal steam heating units (radiators, unit heaters). Demolish existing air handling units with steam heating coil.Install new hot water boiler, pumps, and hydroni…
Proposal for interior alterations/ addition to roof to accommodate new elevator. Add a 5th unit in the basement of an existing detached dwelling with 4 units.
Removal and replacement of school wood workshop dust collection system complete with installation of two indoor dust collectors on structural equipment pad and interlocked with two new make up air …
Proposed solar photovoltaic panel on roof top.
HVAC - Renovate Existing school facilities, plumbing and HVAC
Renovate Existing school facilities, plumbing and HVAC
Plumbing - Renovate Existing school facilities, plumbing and HVAC
Install 1 backflow preventer
curtain window replacement over swimming pool area.
Installation of a rooftop photovoltaic array on an existing building. Toronto District School Board. Central Technical School.
Page numbers are hidden until the total count is available from the data service.