828 COLLEGE ST
REV02: Proposed revision for provision of a ducted Return Air for unit 2 and unit 3HVAC - Rev - Demolition and construction of new Interior staircase at 830 College Basement (Stair B) and new Inter…
Showing first 7 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV02: Proposed revision for provision of a ducted Return Air for unit 2 and unit 3HVAC - Rev - Demolition and construction of new Interior staircase at 830 College Basement (Stair B) and new Inter…
Rev - PS - Demolition and construction of new Interior staircase at 830 College Basement (Stair B) and new Interior Partitions, revised HVAC System and Plumbing to suit entire Base Building improve…
HVAC - Rev - Demolition and construction of new Interior staircase at 830 College Basement (Stair B) and new Interior Partitions, revised HVAC System and Plumbing to suit entire Base Building impro…
Rev - Demolition and construction of new Interior staircase at 830 College Basement (Stair B) and new Interior Partitions, revised HVAC System and Plumbing to suit entire Base Building improvements…
HVAC - Proposed partial second storey addition at the rear of the building with new structural design, New interior partitions, HVCA system, Plumbing to suit new restaurant on ground floor and resi…
Proposed partial second storey addition at the rear of the building with new structural design, New interior partitions, HVCA system, Plumbing to suit new restaurant on ground floor and residence o…
Plumbing - Proposed partial second storey addition at the rear of the building with new structural design, New interior partitions, HVCA system, Plumbing to suit new restaurant on ground floor and …
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.