905 KING ST W
Proposal to install 2 new double interlock pre-action sprinkler systems for a new data hall fit-out in an existing vacant space on the third level. See also 26-189921 BLD 00 BA
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to install 2 new double interlock pre-action sprinkler systems for a new data hall fit-out in an existing vacant space on the third level. See also 26-189921 BLD 00 BA
Proposal to upgrade the infrastructure of the entire facility to increase both the electrical and a mechanical /cooling capacity of the building to allow for the future installation of data centre …
HVAC - Proposal to upgrade the infrastructure of the entire facility to increase both the electrical and a mechanical /cooling capacity of the building to allow for the future installation of data …
HVAC - Proposed interior alterations
Proposed demolition of existing office space and installation of infrastructure to facilitate future data hall fit-out.
PROPOSED: DESIGN FOR ELECTROMAGNETIC LOCKING DEVICES FOR FIVE (5) DOORS (DOORS 3, 4, 6, 12 AND 17) AS WELL AS ALL ASSOCIATED LIFE SAFETY REQUIREMENTS.
HVAC - Proposal for interior alterations to 2nd floor of existing office.
Plumbing - Proposal for interior alteration to an office on the 4th floor of the building to accommodate a data centre.
HVAC - Proposal for interior alteration to an office on the 4th floor of the building to accommodate a data centre.
FS - Sprinkler Shop Drawing - Proposed interior alteration to 2nd floor to create space to house 3 generators, and basement (level B3) in existing office building.
Proposed interior alterations to the building to replace 1 chiller on the roof and a backup generator as well as cooling infrastucture upgrades throughout the building row permit for encroachment a…
HVAC - Proposed interior alterations to the building to replace 1 chiller on the roof and a backup generator as well as colling infrastucture upgrades throughout the building
Proposal to install 15 maglocks in existing office building on the 2nd floor - Allied Reit Inc
Plumbing - Proposal to construct interior alterations to the data centre in the existing office building.
Proposal to install a Novec 1230 Fire Detection Suppression System on the ground and second floor of a multiple unit building for a server room..
Proposal for interior alterations to create electrical room on P2 parking level in existing office building (37m2)
HVAC - Proposal for interior alterations to create electrical room on P2 parking level in existing office building (37m2)
Plumbing - Proposed interior alterations to 5th floor office space (Computer room). Proposal includes HVAC and plumbing. - REVISED DWGS SUBMITTED JUNE 26 2012
HVAC - Proposed interior alterations to 5th floor office space (Computer room). Proposal includes HVAC and plumbing.
Build interior partitions.