Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Drain - Construct a 6-storey municipal shelter (HSCIS) containing 80 beds and support space
Drain - Construct a 6-storey municipal shelter (HSCIS) containing 80 beds and support space
Plumbing - Construct a 6-storey municipal shelter (HSCIS) containing 80 beds and support space
HVAC - Construct a 6-storey municipal shelter (HSCIS) containing 80 beds and support space
Construct a six storey municipal shelter (HSCIS) containing 80 beds and a support space.
AS is to utilize a reversomatic DVG-200
Site Services - Construct a 6-storey municipal shelter (HSCIS) containing 80 beds and support space
Proposal to replace fire alarm control panel for existing store.
Proposed supply and install (1) like for like HVAC roof top unit.
Plumbing - Proposed interior alterations. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls, and ceiling - unit 33
Proposed interior alterations. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls, and ceiling - unit 33 (Nails Salon)
HVAC - Proposed interior alterations. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls, and ceiling - unit 33
Building a mobile stage for a community event UJA Walk
Application for a permit to erect and display three first party wall signs, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign1: 2.27m L x 5.18 W x 0.13m D at…
SITE SERVICING PERMIT - TO INSTALL PIPING CONNECTING TO A STORAGE TANK. NO CONNECTIONS TO CITY STORM OR SANI
Plumbing - Proposal for Dental office fit out
Application for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign: 1.78m L x 3.66m W x 0.13m D at a …
Revision 01 - Revision to new kitchen exhaust system----------------------------------------------------------------------Proposal to install new kitchen exhaust system
Rev 01: revise to reflect correct unit numbers on drawings. No changes to design. Correct number should be Unit #850 - #852The scope of work is limited to interior alterations to the existing resta…
Page numbers are hidden until the total count is available from the data service.