2 UNION ST
Part Permit - New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with two connected Pedestrian Tunnels access to the two Platforms. A new St. Clair Ave West pedestri…
Some text filters were temporarily ignored because the data service timed out.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Part Permit - New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with two connected Pedestrian Tunnels access to the two Platforms. A new St. Clair Ave West pedestri…
HVAC - Proposal for demolishing existing bungalow and build a new three storey fourplex
Revision 03: Changes include reconfiguration of the kitchen and powder room layouts along with a new window/door opening on the east wall of the ground floor. A new deck has been added to the rear.…
Revision 01: Revised basement layout to modify egress requirements. Proposal for a new 2 Unit-Detached
Rev 01: Permit revisionProposal for interior alterations and a 1 storey addition in the rear.
REV 01: Change the positions and ductwork of the fan coils FC-1 and FC-2 due to problems with the height of the space, in renovating the studio for the Randolph College for the Performing Arts with…
REV 01: Revisions as per bubble changesPlumbing - Proposed interior alteration to create a studio space for the Randolph College for the Performing Arts within the Daniels Artworks mixed-use condom…
HVAC - Proposal for alterations to dwelling due to fire damage.
REVISION-01: ON THE 3RD FLOOR REDUCES THE AREA OF SUITE #302 TO CREATE A SECOND SUITE FOR FUTURE LEASEPROPOSED INTERIOR ALTERATIONS ON 3RD FLOOR FOR OFFICE SUITE FITOUT.
REVISION-01HVAC - PROPOSED INTERIOR ALTERATIONS ON 3RD FLOOR FOR OFFICE SUITE FITOUT.
REVISION-01Plumbing - PROPOSED INTERIOR ALTERATIONS ON 3RD FLOOR FOR OFFICE SUITE FITOUT.
REVISION - revised drawingsRetrofit existing heated air makeup unit. replace with high efficiency heater and AC unit.
1 wall sign**DOT&BEA**
Revision to addition (less than 2m2 extra addition to previous issued permit)Proposal for main floor addition and basement side entrance.
Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.
Revision 01 - Revision 01 - due site conditions and landlord repairsHVAC - Proposed interior alterations and repairs due to fire damage.
Drain - Interior renovation to construct a residential 5-plex
Revision 01 - due site conditions and landlord repairsPlumbing - Proposed interior alterations and repairs due to fire damage.
Drain - PROPOSED BASEMENT UNDERPINNING, BEAM COLUMN ADDITION IN THE BASEMENT AND FOUNDATION WALL REPLACEMENT [NEW FOOTING & FOUNDATION WALL LENGTH =29.57m
REV: Proposal for revised height changes and Proposal to construct a new two storey garden suite.
Page numbers are hidden until the total count is available from the data service.