100 WELLINGTON ST W
Remove existing MPH fire and jockey pumps and 2 controllers.Supply and install new VIL electric fire pump 500gpm @ 65psi c/w fire pump controller (no transfer switch). Like for like replacement. Su…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Remove existing MPH fire and jockey pumps and 2 controllers.Supply and install new VIL electric fire pump 500gpm @ 65psi c/w fire pump controller (no transfer switch). Like for like replacement. Su…
Proposed addition of one (1) HVAC VAV into room.
Proposal for interior alterations to renovate library and washroom area.
Plumbing - Proposal for interior alterations to renovate library and washroom area.
Replace the existing 500 GPM @ 65 PSI Fire Pump in the penthouse with a new 500GPM @ 65PSI Fire Pump and controller. The existing jockey pump in the penthouse will also be replaced with a like-for-…
Proposal for Pre-Action valve replacement in an existing commercial building.
HVAC - Proposal for return to base and washrooms finishes update
Proposal for return to base building shell for floors 11 and 20
Proposal to interior alterations for office
Plumbing - Proposal to interior alterations for office
HVAC - Proposal to interior alterations for office
Proposed interior alterations on the thirty-first floor of the west tower at the toronto-dominion centre.
HVAC - Proposed interior alterations on the thirty-first floor of the west tower at the toronto-dominion centre.
Proposal for replacing 2 fire pumps and sunction and discharge control valves and
Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
HVAC - Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
Plumbing - Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
Backflow Replacement
Connect to existing overhead sprinkler system to provide sprinkler coverage under existing obstruction (HVAC, piping) P1 level mechanical room
ADDITION OF NEW PORTABLE AC UNIT WITH CONDENSATE PUMP
Page numbers are hidden until the total count is available from the data service.