145 KING ST W
REVISION - adding ceiling to construction area under this permit to match the remaining of the floor.Proposal to construct a demising wall to separate the unit (suite 200) from corridor.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION - adding ceiling to construction area under this permit to match the remaining of the floor.Proposal to construct a demising wall to separate the unit (suite 200) from corridor.
HVAC - Proposal for expansion/interior alterations of suite 2750.
HVAC - Proposed interior alteration of existing group D occupancy - Level 25
Proposed interior alteration of existing group D occupancy - Level 25
Proposed plumbing alterations for washroom refresh.
Proposed interior alterations for lobby renovation.
HVAC - Proposed interior alterations for lobby renovation.
REVISION - REDUCTION IN SCOPE OF WORK, INCLUDING REMOVAL OF DEMOLITION AND CONSTRUCTION IN SERVERY 10-03.HVAC - Proposal for interior alterations to existing office space - SUITE 1005
REVISION - REDUCTION IN SCOPE OF WORK, INCLUDING REMOVAL OF DEMOLITION AND CONSTRUCTION IN SERVERY 10-03.Proposal for interior alterations to existing office space - SUITE 1005
REVISION - REDUCTION IN SCOPE OF WORK, INCLUDING REMOVAL OF DEMOLITION AND CONSTRUCTION IN SERVERY 10-03.Plumbing - Proposal for interior alterations to existing office space - SUITE 1005
Revision 02 - Remove new FHC and extend ex. FHC to 100' hose.Revision 01 - REVISION TO INTERIOR LAYOUT, SPECIFICALLY, ROOM 1605 CHANGED FROM CLOSET TO ENLARGED LAN ROOM, COMMON CORRIDOR 1620 LAYOUT…
Proposed interior alterations to office Suite 200
HVAC - Proposed interior alterations to office Suite 200
Plumbing - Proposed interior alterations to office Suite 200
Revision 01: Adjustment to Rooms 20-03, 20-04, 20-05 on Level 20Proposal for interior alterations to existing office space - Level 20 and 21. New interconnecting stair connecting Levels 20 and 21. …
HVAC - Interior alterations of existing take-out restaurant within food court on Concourse Level Unit 6 & 7
Interior alterations of existing take-out restaurant within food court on Concourse Level Unit 6 & 7 - Pokerito Restaurant
Plumbing - Interior alterations of existing take-out restaurant within food court on Concourse Level Unit 6 & 7
Revision 01 - REVISION TO INTERIOR LAYOUT, SPECIFICALLY, ROOM 1605 CHANGED FROM CLOSET TO ENLARGED LAN ROOM, COMMON CORRIDOR 1620 LAYOUT MODIFIED, SINGLE TENANT ENTRY DOOR 1630A CHANGED FROM EX. SO…
Revision 01 - REVISION TO INTERIOR LAYOUT, SPECIFICALLY, ROOM 1605 CHANGED FROM CLOSET TO ENLARGED LAN ROOM, COMMON CORRIDOR 1620 LAYOUT MODIFIED, SINGLE TENANT ENTRY DOOR 1630A CHANGED FROM EX. SO…
Page numbers are hidden until the total count is available from the data service.