150 BLOOR ST W
HVAC - Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Sprinklers Alteration - review of submitted drawings sprinklers only
7 SIGNS = 2 wall signs on 1st storey, south elevation, 2 window signs on 1st storey, south elevation, 1 wall sign 1st storey, West elevation, 1 Wall sign 2nd storey, West elevation, 1 projecting si…
Proposed new restaurant in an existing ground and mezzanine level tenant space at 150 Bloor Street West. There will be 100 dining seats on the ground floor and 130 dining seats at the mezzanine lev…
Interior alterations of an existing suite - including HVAC, plumbing and electrical work - Tim Horton's
Plumbing - Interior alterations of an existing suite - including HVAC, plumbing and electrical work - Tim Horton's
Plumbing - Proposal for interior alterations to an existing vacant commecial unit for new restaurant, less than 30 seats - "Dickey's Barbeque Pit"
Proposal for interior alterations to an existing vacant commecial unit for new restaurant, less than 30 seats - "Dickey's Barbeque Pit"
Proposal for interior alterations to an existing office unit M3, located on the mezzanine floor level for existing tenant - 'Louis Vuitton Corporate Regional Office'.
HVAC - Proposed interior alterations to an existing office space. *Louis Vuitton*
Drain - inside storm pipingStorm pumps replacement and the associated components at Lower Bay-Museum Station
Storm pumps replacement and the associated components at Lower Bay-Museum Station
Plumbing - Storm pumps replacement and the associated components at Lower Bay-Museum Station
REVISION - changes to the stair designProposal for interior alterations to the add a new exit stair on the south/east corner of the existing multiple use building.
Proposal for interior alterations to the add a new exit stair on the south/east corner of the existing multiple use building.
Proposed new fire alarm control system installation and sprinkler system modification for existing mulitple unit - non residental building,
REV 01 - to room configurationProposal for interior alterations to existing office space on the 2nd floor "Edgepoint Wealth Management" (126m2)
Proposal for interior alterations to existing office space on the 2nd floor "Edgepoint Wealth Management" (126m2)
To complete interior alterations (189 m2) to the 9th floor of the existing office building.
Page numbers are hidden until the total count is available from the data service.