Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for interior renovation of existing office suite on the second level of the building. This includes demolition of office walls, building of new office walls and ceilings, and the re…
Proposal for interior renovation of existing office suite on the second level of the building. This includes demolition of office walls, building of new office walls and ceilings, and the rework of…
HVAC - LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON.…
LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON. The du…
REV01: Proposed revisions for teaching lab, quiet room and level 8 & 9HVAC - Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The …
REV01: Proposed revisions for teaching lab, quiet room and level 8 & 9Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent …
Installation of a temporary 10.5 m x 6.0 m LED screen and scaffold support structure, including a temporary production tent and associated event infrastructure for a FIFA 2026-related event at King…
HVAC replacement
HVAC replacement
Add a floor drain to new ground floor mechanical room in the Research LabConvenience address is 160 College St
Drain - Demolition of block 'B' of the existing Medical Sciences Building at the Universty of Toronto. The existing building is located at the southeast corner of King's College Road and King's Col…
HVAC - Selective demo, new partitions, new doors & frames, modifications to power, lights, HVAC, sprinkler, replace sink (one for one), new millwork, new finishes.
Selective demo, new partitions, new doors & frames, modifications to power, lights, HVAC, sprinkler, replace sink (one for one), new millwork, new finishes.
Drain - Demolition of block 'B' of the existing Medical Sciences Building at the Universty of Toronto. The existing building is located at the southeast corner of King's College Road and King's Col…
Partial demolition of block 'B' of the existing Medical Sciences Building at the Universty of Toronto. The existing building is located at the southeast corner of King's College Road and King's Col…
Plumbing - Demolition of block 'B' of the existing Medical Sciences Building at the Universty of Toronto. The existing building is located at the southeast corner of King's College Road and King's …
HVAC - Demolition of block 'B' of the existing Medical Sciences Building at the Universty of Toronto. The existing building is located at the southeast corner of King's College Road and King's Coll…
1 Ground Sign ** BICENTENNIAL HOUSE **
Proposal to replace the existing fire pump.
Page numbers are hidden until the total count is available from the data service.