150 SHERWAY DR
Revision 03: New 200mm watermain and water connection, including meter and check valve in accordance with City standards, which is located east of the existing Dorothy Ley Hospice Building (220 She…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 03: New 200mm watermain and water connection, including meter and check valve in accordance with City standards, which is located east of the existing Dorothy Ley Hospice Building (220 She…
Proposal to install Maglock/Magnetic locks at the interior and exterior doors at new patient tower building, Central Utility Plan and Tunnel area.
REV Drain - Proposal for Installation of new 200mm PVC Sanitary Sewer on East of McCall Building.Drain - Proposal for construction of new 9-storey Patient Tower,1-Storey Circulation Link connected …
2 Wall Sign for Trillium Hospital - 'ENTRANCE 6' & 'ENTRANCE 5'
Proposed demolition of existing Hospital Central Utility Plant (CUP) building- including services - and adjacent brick chimney and steel stack.
To erect and display 6 ground signs all displaying static copy.
Proposed installation and modification of overhead wet sprinkler system to accommodate the renovation of and existing interior hospital building space.
REVISION No. 04 for RETAINING WALL / PERMANENT CAISSON WALL EXTENSION TO ZONE PW3.REVISION 03: Construction of Shoring related to CUP & TunnelsRevision 02: Permanent caisson wall shoring design pac…
REVISION 01: Civil / Site Services Scope related to CUP & Tunnels.Drain - Proposal for construction of new 9-storey Patient Tower,1-Storey Circulation Link connected to the eixsiting hospital build…
REVISION 03: Construction of Shoring related to CUP & TunnelsRevision 02: Permanent caisson wall shoring design package from shoring tradeRevistion 01: RESUBMISSION: SKETCHES FOR MINOR TOWER FOUNDA…
Revision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.HVAC - Proposal for construction of New 2 storey Central Ut…
Revision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.1Proposal for construction of New 2 storey Central Utility …
Revision #01 - Revised Design of Circulation Tunnels linking the New Central Utility Plant (CUP), New Patient Tower and Existing Hospital.Plumbing - Proposal for construction of New 2 storey Centra…
Revision 02: Permanent caisson wall shoring design package from shoring tradeRevistion 01: RESUBMISSION: SKETCHES FOR MINOR TOWER FOUNDATION REVISIONS AND SHORING DESIGN PACKAGE FROM SHORING TRADE.…
To erect and display two first party ground signs, illuminated and displaying static copy, both measuring 2.41m vertically by 1.44m horizontally, with overall height of 2.69m. Portion of ground sig…
REVISION 01: ADD WASHROOMPlumbing - Proposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre
proposal for interior alterations to second floor to create a new pulmonary rehab training room and shared administration office.
HVAC - proposal for interior alterations to second floor to create a new pulmonary rehab training room and shared administration office.
REVISION 01: ADD WASHROOM and add an electrical transformer to feed the fire pumpProposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trill…
REVISION 01: ADD WASHROOMHVAC - Proposal to construct a new open air 8 level precast parking structure to provide staff and public parking for Trillium Health Centre