161 COMMANDER BLVD
Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roo…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roo…
HVAC - Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associa…
REVISION 06 - REVISION TO PERMIT # 22 114146REVISIONS HAVE BEEN MADE TO REFLECT ONSITE CONSTRUCTION. AS WELL AS THECONSTRUCTION OF THE TEMPORARY MAINTENANCE SHOP REPLACING THE CURRENTCLEANING ROOM …
REV Plumbing - interior alterations to existing industrial building
REVISION 05: INCLUDES UPDATED DRAWINGS TO MEZZANINE PLAN TO INDICATE FIRE RATING REQUIREMENTSREVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes d…
REVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision - addition of airlocks around the warehou…
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to Plumbing - addition of airlocks around…
PROPOSED: INSTALLATION OF 6" UNDERGROUND STORM DRAINS HAS CHANGED LOCATIONS AS SHOWN ON PREVIOUS PERMIT 19 210309 STS (ESTEE LAUDER)
Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
interior alterations to existing industrial building
Plumbing - interior alterations to existing industrial building
interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" PHASE 3A
Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.
REV 01 - to fire and life safety
Plumbing - Proposed production area emergency drainage and retention.
Proposed production area emergency drainage and retention.