173 KING ST W
Proposed new storefront framing and clad the glazed return wall. Consturction does not extend to underside of deck; no fire-resistance rating claimed. Material allowance based on approximately 8-fo…
Showing first 3 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed new storefront framing and clad the glazed return wall. Consturction does not extend to underside of deck; no fire-resistance rating claimed. Material allowance based on approximately 8-fo…
Reconfigure piping to relocate existing backflow preventer to downstream to existing water meter -St. Andrew's subway station
HVAC - This is a proposal for the TTC's Easier Access Project, Phase 3 at St. Andrew Station. The construction is to include one new elevator and an existing elevator to be replaced.
End of list for these filters.
Updated Nov 21, 2026