Rev 02: adding a new wall and door 200H. This door will require a magnetic lock, which will be applied for separately by SHN's consultant. Proposed Interior Alterations of the second storey of an e…
REVISION - Dispensary area at gridline E9 (shown below) was empty, this revision is to add a small consult room and millwork to the spaceProposed Interior Alterations of the second storey of an exi…
Interior alterations to renovate existing RBC Bank - Unit 100, to create two client meeting rooms within the existing footprint. There is no change in rentable space or additional footprint. Mechan…
Proposed Interior Alterations of the second storey of an existing four storey building. from an office space to a proposed medical office space. The space will be comprised of an outpatient clinic …