2191 YONGE ST
Plumbing - Proposal for interior alterations to first floor and third floor amenities area
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposal for interior alterations to first floor and third floor amenities area
Proposal for interior alterations to first floor and third floor amenities area
HVAC - Proposal for interior alterations to first floor and third floor amenities area
Fire damage repairs to te balcony of unit 4002.
Proposed repairs for underground parking garage of existing residential condominium.
Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit. Run o…
HVAC - Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit…
HVAC - Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.
Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.