318 LAWRENCE AVE E
Proposed storage structure for school by using two 40ft shippping containers stacked.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed storage structure for school by using two 40ft shippping containers stacked.
Proposed construct temporary classroom for Toronto French School install date: October 14, 2026, tear down date June 30, 2027
Drain - Proposal for a 3 storey & basement addition to an existing independent school.
HVAC - Proposal for a 3 storey & basement addition to an existing independent school.
Plumbing - Proposal for a 3 storey & basement addition to an existing independent school.
Proposal for a 3 storey & basement addition to an existing independent school.See 26 -148097 ALT 00 AS
Drain - Proposal for a 3 storey & basement addition to an existing independent school.
HVAC - REPLACEMENT ROOF TOP UNIT
Plumbing - REPLACEMENT ROOF TOP UNIT
REPLACEMENT ROOF TOP UNIT
Proposal a new three art/performance centre building addition to the Toronto French School (TFS) campus, including a two-level, 350 seat auditorium at ground level, with new classrooms and supporti…
Plumbing - Proposal for minor modifications to existing senior dining hall support spaces (self-serve servery/storage and dish-drop off area). Adding two new water filling stations, decommissioning…
Interior alterations to existing kitchen on the service level within existing Toronto French School
HVAC - Interior alterations to existing kitchen on the service level within existing Toronto French School
Proposal to replace the existing kitchen exhaust hoods and provide a new make-up air unit. See related permit 20-109954 MS.
Proposal for interior alterations to classrooms in an existing school - Toronto French School
Plumbing - Proposal for interior alterations to classrooms in an existing school - Toronto French School
Interior alterations to washroom and artroom to calssroom level B200.* Toronto French School*
HVAC - Interior alterations to washroom and artroom to calssroom level B200.* Toronto French School*
Plumbing - Interior alterations to washroom and artroom to calssroom level B200.* Toronto French School*
Page numbers are hidden until the total count is available from the data service.