320 CARLAW AVE
Revision # 04 - To the interior layout and roof plan as per drawings.REVISON 03 - to interior layout and roof plan as per drawings
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision # 04 - To the interior layout and roof plan as per drawings.REVISON 03 - to interior layout and roof plan as per drawings
REVISON 03 - to interior layout and roof plan as per drawings
REVISON - To add mezzanine and roof deck for units 122-127 inclusive 147,153,154. Revision for interior alterations to relocate mezzanine level to units 122 to 126 inclusive, and increase floor are…
Proposal to construct a deck on the roof for Unit 201at 326 Carlaw Ave.
REVISION - Permit for additional floor area by installing a mezzanine, new set of stairs to roof and new roof deck. - Unit 110.
Permit for additional floor area by installing a mezzanine, new set of stairs to roof and new roof deck. - Unit 110.
Plumbing - Proposal for interior alterations to live/work space (Unit 111).
Proposal for interior alterations to live/work space (Unit 111).
Proposal for interior alterations to construct a new mezzanine level in existing ground floor suite, unit #108. Convenience address is 326 Carlaw Ave.as per committee of adjustment decision-final &…
Revision for interior alterations to relocate mezzanine level to units 122 to 126 inclusive, and increase floor area of mezzanine in unit 134 from 22.38m2 to 52.76m2 (increase of 30.38m2).
Proposal for interior alterations to the following units:Renovatiing and adding mezzanine to units on level 1 first floor, 122,123,124,126,127,147,151,152,153,154,155,156,157,158,159,160,161. Also …
revision to Mezzanine - make interior alterations to unit#225 by constructing a mezzanine and stair up to the new roof deck.
make interior alterations to unit#225 by constructing a mezzanine and stair up to the new roof deck.
install new plumbing fixtures. See fixture schedule attached.unit 109
construct mezzanine in unit 138 (conv address 1173 dundas st e)
Plumbing - install fixtures in suite 111- 1 w.c., 1 w.b., 1 shower, 1 2-compt. k.s., 1 d.w., 1 l.t.; mezzanine level- 1 w.c., 1 b.t., 2 w.b., 1 shower.
make interior alterations and construct mezzanine level, paint overhead steels over mezzanine with colour scheme to prevent localized headroom hazard. suite 111No physical file- Site review reports…
make interior alterations and construct mezzanine level addition in existing live/work unit.unit 130 (conv. address is 1173 Dundas St. W.)
install in unit 129 on 1st floor: 2 w.b., 2 w.c., 1 b.t., 2 shower, 1 h.w.t., 1 k.s., 1 dishwasher.cost included 01-146856 edc(unit 129 on first floor - (conv. address 1173 Dundas St. E.)
install plumbing fixtures in unit 206: 1 WC, 1 BT and 2 WB. Cost incl: 01-125341
Page numbers are hidden until the total count is available from the data service.