Showing first 10 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 1: Revised grading/inverts as required to suit property severance.Drain - Install 12 manholes, 105.4 lm sani drain, 758.4 lm of STM sani and siamese connection to Backflow preventerConstru…
Drain - Proposed 1.5 storey open air parking structure
Plumbing - Proposed 1.5 storey open air parking structure
Proposed consent for severance and creation of mutual property easements. Severed Lot. Addition of Hyatt Place Hotel SPA under file 18 259547 WET 02 SA.
Proposed consent for severance and creation of mutual property easements. Retained Lot. Addition of Hyatt Place Hotel SPA under file 18 259547 WET 02 SA.
Plumbing - See Plumbing data sheet and new siamese connection to Back Flow Preventer.Construct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, f…
New construction of an 8-storey, 196 suite Hyatt Place hotel. The ground level podium will contain lobby & breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool.
Drain - Install 12 manholes, 105.4 lm sani drain, 758.4 lm of STM sani and siamese connection to Backflow preventerConstruct an 8 storey hotel. The ground level podium will contain lobby and breakf…
HVAC - Construct an 8 storey hotel. The ground level podium will contain lobby and breakfast spaces, 3 meeting rooms, fitness room, sun room, and pool. The tower will contain 196 guest suites. The …
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.