38 AVENUE RD
Plumbing - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifica…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifica…
Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and f…
HVAC - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modification…
Proposal for alterations to parking garage (waterproofing and concrete repairs).
Proposal for plumbing alterations, rough-in & connect.
HVAC - Proposal for interior alterations of an existing single storey residential unit located on the 22nd floor of a 26 storey apartment building. All work to exist within the current boundary of …
Plumbing - Proposal for interior alterations of an existing single storey residential unit located on the 22nd floor of a 26 storey apartment building. All work to exist within the current boundary…
Plumbing - Proposal for interior alteration of an existing retail space.
HVAC - Interior Alterations to supply new spa store with new plumbing fixtures.
Plumbing - Interior Alterations to supply new spa store with new plumbing fixtures.
Interior Alterations to supply new spa store with new plumbing fixtures.
Fire alarm replacement and modifications to existing Equipment
Revision 02 - paritions, doors, stair and liftRevision to interior - Construct new townhouse - Unit D - end unit facing Lytton Ave
proposal for brick replacement and mortar joint replacing on the north, south, and west elevations; sealant replacement on the east elevation; and mechanical vent replacement on the west elevation.
Installation of a backflow preventor for the multiple use building - ground floor restaurant and residential units above
REV 03: Revision to OBC matrix, etc to correct deficiencies identified onsite by InspectorChange of proposed construction to non-combustible elementsREVISION - updated structural drawings FORInteri…
Revision # 02 - Updated Structural drawings.REVISION - updated structural drawings FORInterior alteration to existing ground floor (73.2m2) commercial space in an existing mixed use building - Unit C9
Proposal for interior alterations to an existing residential suite on the 7th floor - Unit T715
REVISION - updated structural drawings FORInterior alteration to existing ground floor (73.2m2) commercial space in an existing mixed use building - Unit C9
HVAC - Interior alteration to existing ground floor (73.2m2) commercial space in an existing mixed use building - Unit C9
Page numbers are hidden until the total count is available from the data service.