450 KIPLING AVE
4 non-illuminated Wall Signs displaying static copy approved in conjunction with 26-197348 ZMP 00 ZR with the following dimensions:Sign 1 2.74m L x 2.44m W x 0.23m D x 7.84m H above Grade, Sign Fac…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
4 non-illuminated Wall Signs displaying static copy approved in conjunction with 26-197348 ZMP 00 ZR with the following dimensions:Sign 1 2.74m L x 2.44m W x 0.23m D x 7.84m H above Grade, Sign Fac…
Proposal for alternative solutions for code analysis reports on behalf of Checkpoint Group in support of the proposed building addition and fit-out at 450 Kipling Ave which will contain a new autom…
Proposal for alternative solutions for code analysis reports in support of the proposed building addition and fit-out which will contain a new Automated Storage and Retrieval (ASRS) systems for the…
Proposal to construct an automated storage and retrrieval (ASRS) system within an existing warehouse
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site condi…
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site condi…
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site condi…
Drain - Upgrade the storm collection network through installing new catch basins and treatment tank in the waste area and connect to existing storm. Re-surface the paved areas with proper slopes to…
Upgrade the storm collection network through installing new catch basins and treatment tank in the waste area and connect to existing storm. Re-surface the paved areas with proper slopes towards th…
Proposal to replace existing 8" Zurn 475 RP premise isolation backflow preventer because it is beyond repair with a 3" Watts 009.
Rev 01 - To remove Fire Pump from Mechanical Room, Add new Rainwater Irrigation system c/w underground tanks. Added dividing wall b/w warehouse & office area. Landscape revisions to suit site condi…
New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Drain - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Plumbing - New warehouse shall be used for storage and distribution while the 2 floor office shall be used for existing administration department which shall be relocated from the existing building
Proposal for adding a new sanitary pipe to the existing municipal sanitary pipe.
REV 01 - Changes as per bubbled drawing. Proposal for the addition of new Sanitary pipe in the existing "YAYA Food Corp." Building.
HVAC - Proposed addition for chemical tanks warehouse
Proposed addition for chemical tanks warehouse
Proposal for the addition of new Sanitary pipe in the existing "YAYA Food Corp." Building.
Page numbers are hidden until the total count is available from the data service.