Showing first 6 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed plumbing permit for restaurant. Existing grease interceptor, rinse sink, and compartment sink to be replaced with exact same models and sizes. No changes toexisting plumbing and layout.
Proposed: Replace kitchen ecology units/exhaust hoods & associated duckwork, along with additional MUA fan.
This is for a new restaurant greater than 30 seats on the ground floor of this multi unit building. The occupant load is to be 210 persons. This includes HVAC and Plumbing.
HVAC - Proposal to construct a new 12 sty condo (178 dwelling units) with ground floor retail and 4 levels of below grade parking.
Proposal to construct a new 12 sty condo (178 dwelling units) with ground floor retail and 4 levels of below grade parking.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.