483 BAY ST
Revision 02: Revision to permit, updated HVAC drawings for demolition, 9th floor and 10th floor HVAC layout (as bubbled)_____________________________________________________________________________…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 02: Revision to permit, updated HVAC drawings for demolition, 9th floor and 10th floor HVAC layout (as bubbled)_____________________________________________________________________________…
Revision 01: Revision to permit, updated HVAC drawings for demolition, 9th floor and 10th floor HVAC layout__________________________________________________________HVAC - Proposal for interior alt…
Proposal for Electromagnetic Locking device work related to permit file 26 119318
Localized concrete repairs, podium deck waterproofing repairs, and piping repairs
Revision 01: Remove and reinstall existing fire alarm pull stations on the 9th and 10th floors, located in the existing staircasesProposal for interior alterations to office space - level 4,5, 9,10
Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural at levels B4, B2, B1, Ground, Levels 2, 4, 5 and 6 at the North Tower. Also includes floors 7 an…
HVAC - Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural
Plumbing - Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural
Drain - Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural
Proposal to install multiple maglocks.
HVAC - Proposal for partial interior alterations to floor 5 and 10
Plumbing - Proposal for interior alterations to add showers and change rooms to the B2 Level.
Proposal for interior alterations to add showers and change rooms to the B2 Level.
HVAC - Proposal for interior alterations to add showers and change rooms to the B2 Level.
HVAC - Proposal for interior alterations to office space - level 4,5, 9,10
Plumbing - Proposal for interior alterations to office space - level 4,5, 9,10
Proposal for interior alterations to office space - level 4,5, 9,10
Proposal for interior alterations to add a universal washroom to lower level.
Plumbing - Proposal for interior alterations to add a universal washroom to lower level.
HVAC - Proposal for interior alterations to add a universal washroom to lower level.
Page numbers are hidden until the total count is available from the data service.