550 BAYVIEW AVE
Rev 03: changes to solar photovoltaic layout and detailsREV 02: Sprinkler fire protection modificationsRevision and addition of new exit door and replacement of exit door with roll-up door.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 03: changes to solar photovoltaic layout and detailsREV 02: Sprinkler fire protection modificationsRevision and addition of new exit door and replacement of exit door with roll-up door.
FS - Sprinkler Shop Drawing - Proposal for interior alterations and exterior patio - Building #14
Plumbing Revision 01 - Revision to spec for replacement rooftop HVAC units for Building 1 at Evergreen Brickworks; revised replacement rooftop units weigh less than previous replacement rooftop uni…
HVAC Revision 01 - Revision to spec for replacement rooftop HVAC units for Building 1 at Evergreen Brickworks; revised replacement rooftop units weigh less than previous replacement rooftop units, …
Plumbing - Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
Proposed structural reinforcement of existing columns, update and reinforcement of existing ramps/walkways, handrails around displays, updated lighting
HVAC - Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
HVAC - Proposal to demolish existing Trellis Structure and construction of new trellis with permanent bench seating. Relocation of drinking fountain
Geothermal field comprising of 40 boreholes with field repair of 5 new geothermal boreholes
REV 02: Sprinkler fire protection modificationsRevision and addition of new exit door and replacement of exit door with roll-up door.
Revision and addition of new exit door and replacement of exit door with roll-up door.
Plumbing - Phase 3 classroom mezzanine, gallery finishes, general finishes, handrails, steel details and remaining mechanical and electrical scope.conservation work. Phase 1 Permit 17 115797 BLD
HVAC - Phase 3 classroom mezzanine, gallery finishes, general finishes, handrails, steel details and remaining mechanical and electrical scope.conservation work. Phase 1 Permit 17 115797 BLD
Phase 3 classroom mezzanine, gallery finishes, general finishes, handrails, steel details and remaining mechanical and electrical scope.conservation work. Phase 1 Permit 17 115797 BLD, Phase 2 perm…
Phase 2 of 3 Phases of work (Building 16). Involves primarily envelope work including roof insulation, new glazing, replacement doors, select M&E systems, minor landscape works. Also includes minor…
Proposal to repair the raised floor system throughout the existing building
Applicant proposed to add a new structure to the roof of the existing building for " Seasonal Events - Ice skating rick and picnic area.
Permit to structurally reinforce floor for installation of new safe.
Proposal to install graywater harvesting system for existing office/assembly use building #12.Jan.6/11 - left message for David Stonehouse
Updated Nov 15, 2026