361 FRONT ST W
Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings,
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings,
REV 01: Providing heating, ventilation and air conditioning system design for the USEP building. Related to main building permit 22 237137 BLD 00 NBHVAC - Construction of new platforms, with canopi…
REV 01: Providing fire protection system design for the USEP building. Related to Building Permit 22 237137 BLD 00 NB. FS - Sprinkler Shop Drawing - Construction of new platforms, with canopies and…
REV 01: Providing plumbing system design for the USEP building. Related to Main Building Permit 22 237137 BLD 00 NBPlumbing - Construction of new platforms, with canopies and vertical access elemen…
REV 03: Revision to permit due to change of height to sprinkler layout in the Truck Tunnel. REV 02 - Revision to sprinkler drawings - Revision to permit due to elevation change to sprinkler layout …
Rev # 2- Revision includes a new temporary stair pressurization system and sprinkler modifications to the existing stair following ramp removal. The scope comprises temporary ductwork and a pressur…
Rev 01 - Revision includes a new temporary stair pressurization system and sprinkler modifications to the existing stair following ramp removal. The scope comprises temporary ductwork and a pressur…
REV 01: Supply and install a new sprinkler system on the third floor and connect to the existing sprinkler riser. Supply and install one new fire hose cabinet with 100'-0" hose. Replace exiting fir…
Proposal for interior alterations for new I.T. data room and roof top antenna installation - necessary in advance for FIFA
Kitchen exhaust damper installation
The early works scope includes rerouting all horizontal storm water pipes currently located beneath the 1970¿s trainshed and reroutes toward the north. This rerouting is intended to facilitate futu…
Drain - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new platforms that will connect the York, Bay and …
Rev 01 - Permit # 12 134310 BLD 01 BA. Renovation to the VIA Transfer Hall and Bay Street Retail concourses. This application is intended to re-open the permit to allow for Project Close-out.STAGE …
INSTALLATION OF NEW NON-LOCKABLE SEMI-TRANSPARENT ROLLER SCREEN IN OPEN MARKET BOOTH. REFER TO ALTERNATIVE SOLUTION 20 107565 ALT 00
HVAC - First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, constructing a temporary acc…
Plumbing - First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, constructing a temporary…
Proposal for interior alterations to replace and upgrade the Great Hall Chandeliers - Union Station
REV: The revision include the removal of ramp T202 and associated partitions, a revision to a west partition to become exterior wall GB9, a revision to the door schedule, door B06A, to become an in…
Installation of multi-media artwork in historic carraigeway space in Union Station Moat, and associated sprinkler and electrical modifications
Proposal for concrete balconies localized repairs, waterproofing and painting.