Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposal for Interior Alterations for tenant fitout, dential office
HVAC - Proposal for Interior Alterations for tenant fitout, dential office
Proposal for Interior Alterations for tenant fit out, dental office
Plumbing - Proposal for interior alterations, fitout for new office.
Proposal for interior alterations, fitout for new office.
HVAC - Proposal for interior alterations, fitout for new office.
REV06: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
HVAC - Proposal for interior alterations to office space (main and second floor).
Proposal for interior alterations to office space (main and second floor).
Revision 05 - layout changes for Block A Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctu…
Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctural changes for block AREVISION 02: The b…
REVISION 03 : stuctural changes for block AREVISION 02: The block originally had 8 units, but we have decided to split 4 double units into eightsingle units. As a result, there are now a total of 1…
HVAC - Proposed interior alterations for Block A - Unit 1 Tenant Fitout.
Proposed interior alterations for Block A - Unit 1 Tenant Fitout.
REVISION - interior layout changesInterior alterations for storage with ancillary office on the second floor - unit 13 (Block C - construction Unit 29)
Revision 02 - Added rough-in plumbingRevision - match as built and FFR as per inspectors request
See the attached folder
Administrative permit. The owners of unit 3, have agreed to share a door/access with units 45. This will facilitate better accessibility and convenience for both parties involved.
REVISION 02: The block originally had 8 units, but we have decided to split 4 double units into eightsingle units. As a result, there are now a total of 12 units in the block and making revisions t…
Page numbers are hidden until the total count is available from the data service.