770 DON MILLS RD
Proposal for tent to cover slurry storage tanks needed for ontario line elevated guideway construction at NFS ( don Mills and Gateway Blvd North Leg). Tent will be approx 523 sq. m and 8.68m high a…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for tent to cover slurry storage tanks needed for ontario line elevated guideway construction at NFS ( don Mills and Gateway Blvd North Leg). Tent will be approx 523 sq. m and 8.68m high a…
Proposal for alternative solution for extended travel distance for rooftop service areas
Proposal for the construction of three mock-ups installations and a tent, for key public facing components of the Ontario Line station buildings that will inform system-wide procurement decisions. …
Proposal for temporary site office to accommodate TGP staff working on theconstruction of the Ontario Line's Flemingdon Park Station (NFS).
The proposed Site Services Permit is for temporary water connections for construction activities at Flemingdon Park Station,
FS - Sprinkler Shop Drawing - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and b…
Proposal for alternative solution to code compliance for stations related to the application of emergency power.
The work consists of localized demolition and removal of specific sections of the retaining wall located within the property limits of 770 Don Mills Rd, and not in the right-of-way (ROW), The secti…
Conditional Permit - Part Permit - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east …
REV : Relocation of wet utilities in conflict with guide way piers and station footprint at 770 Don Mills Road. The work involves removal, supply, and installation of sewer system, stormwater, wate…
Proposl for a tent to cover slurry storage tanks at 770 Don Mills Road (NFS). The tent is crucial in protecting Ontario Line construction over the winter months. Tent will be approx 64ft x 88ft (56…
It is proposed to provide an alternative solution approach to code compliance for stations related to the application of spatial separation for exterior walls of the station of prescriptions of OBC…
Proposal for relocation of wet utilities in conflict with guide way piers and station footprint at 770 Don Mills Road. The work involves removal, supply, and installation of sewer system, water mai…
Plumbing - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road to…
The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road to the south …
HVAC - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road to the…
Drain - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road to th…
Drain - The proposed Flemingdon Park Station is located approximately 0.6 km south of the proposed Science Centre station. It isconstrained by Don Mills Road to the east and by a private road to th…
REV01: Proposed revision to revise routing of exhaust duct as shown on drawings.Upgrading the existing kitchen fire suppression system and equipment for the existing commercial kitchen to meet the …
Upgrading the existing kitchen fire suppression system and equipment for the existing commercial kitchen to meet the applicable codes (NFPA 96, OBC) - Ontario Science Centre