980 LANSDOWNE AVE
Rev 03 - To provide minimum unobstructed glass area as per 2012 OBC Table 9.7.2.3.(1) for suite 305 master bedroom and suite 306 bedroom 2 because of as built site conditions.REV 02: Stair F in Bui…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 03 - To provide minimum unobstructed glass area as per 2012 OBC Table 9.7.2.3.(1) for suite 305 master bedroom and suite 306 bedroom 2 because of as built site conditions.REV 02: Stair F in Bui…
REV 02: Proposed Stair E in Building B extended to mechanical penthouse level in order to provide second means of egress as per 2012 OBC 3.3.1.3.(6) requirements.Rev 01 - Proposal to change some wa…
REV 02: Stair F in Building C extended to mechanical penthouse level in order to provide second means of egress as per 2012 OBC 3.3.1.3.(6) requirements.Rev 01 - Proposal to change some wall assemb…
Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.Proposal for 36 Storey tower (Building A )on a 7 Storey Podium and 2 level underground Parking. This is a part of Phas…
Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.Proposal for 29 Storey tower (Building B ). This is a part of Phase 6 of Davenport Village which including 36 Storey T…
Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.Proposal for a 12 Storey tower (Building C )This is a part of Phase 6 of Davenport Village which including 36 Storey T…
Deferred Fees from folder 21 141364 (RSN-4909621) ZoningProcess RSN 70901717
Deferred Fees from folder 21 141393 (RSN-4909655) ZoningProcess RSN 70901729
Deferred Fees from folder 21 141223 (RSN-4909438) ZoningProcess RSN 70901661
Proposal for 29 Storey tower (Building B ). This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey …
Proposal for a 12 Storey tower (Building C )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 Storey …
Proposal for 36 Storey tower (Building A )on a 7 Storey Podium and 2 level underground Parking. This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey…
HVAC - Proposal to construct parking garage related to 56 new townhouses fronting Powerhouse Rd and Brandon Ave.
Plumbing - Proposal to construct Type A interior townhouse unit, as part of 30-unit townhouse block fronting Brandon Ave and Lansdowne Ave.
Plumbing - Proposal to construct Type A interior townhouse unit, as part of 30-unit townhouse block fronting Brandon Ave and Lansdowne Ave.
Plumbing - Proposal to construct Type A interior townhouse unit, as part of 26-unit townhouse block fronting Powerhouse Rd and Lansdowne Ave.
HVAC - Proposal to construct Type A interior townhouse unit, as part of 30-unit townhouse block fronting Brandon Ave and Lansdowne Ave.
HVAC - Proposal to construct Type A interior townhouse unit, as part of 30-unit townhouse block fronting Brandon Ave and Lansdowne Ave.
HVAC - Proposal to construct Type A interior townhouse unit, as part of 26-unit townhouse block fronting Powerhouse Rd and Lansdowne Ave.
Plumbing - Proposal to construct Type A interior townhouse unit, as part of 26-unit townhouse block fronting Powerhouse Rd and Lansdowne Ave.
Page numbers are hidden until the total count is available from the data service.