704 SPADINA AVE
REV: Revision to Permit 26 137322 BLD 00 BA, we are revising the kitchen layout to avoid conflict with the electrical panel rough-in.Proposal for interior alterations for new restaurant with univer…
Showing at least 1–20 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV: Revision to Permit 26 137322 BLD 00 BA, we are revising the kitchen layout to avoid conflict with the electrical panel rough-in.Proposal for interior alterations for new restaurant with univer…
REV HVAC - Revision to Permit 26 137322 BLD 00 BA, we are revising the kitchen layout to avoid conflict with the electrical panel rough-in.The plumbing and HVAC layouts have been revised accordingl…
Proposal for interior alterations
HVAC - Proposal for interior alterations
Plumbing - Proposal for interior alterations
Proposed HVAC Replacement
Proposal for HVAC Replacement
HVAC Replacement
Revision 01 - Revision to indicate 3 NFPA Hoods in lieu of 4 at the top of Tower B 83rd floor (Level 74).-------------------------------------------------------------Proposal to construct a mixed u…
Revision 03 - Revision to indicate 3 NFPA Hoods in lieu of 4 at the top of Tower B 83rd floor (Level 74).--------------------------------------------------------------REVISION 02: Drawing M1-02 to …
REVISION 1: REVISION TO PERMIT 26 118021 PLB 00 PS / 26 118021 HVA 00 MS TO ADD WASHROOM TO PERMIT AS NOTED IN 26 118021 BLD 00 BAHVAC - Proposed interior alterations to an office space. Scope of w…
REVISION 1: REVISION TO PERMIT 26 118021 PLB 00 PS / 26 118021 HVA 00 MS TO ADD WASHROOM TO PERMIT AS NOTED IN 26 118021 BLD 00 BAPlumbing - Proposed interior alterations to an office space. Scope …
Proposed interior alterations to finish basement.
Proposed interior alteration to add folding walls in office space - related to BUILDING PERMIT #25 131728 BLD 00 BA
Deferred Fees from folder 25 210845 (RSN-5691393) ZoningProcess RSN 77967466
Proposed interior fit-out of Level 25 to include open workstations, focus rooms, collaboration spaces, meeting room, servery and kitchenette, breakout spaces and a screening lounge space.
HVAC - Proposed interior fit-out of Level 25 to include open workstations, focus rooms, collaboration spaces, meeting room, servery and kitchenette, breakout spaces and a screening lounge space.
Plumbing - Proposed interior fit-out of Level 25 to include open workstations, focus rooms, collaboration spaces, meeting room, servery and kitchenette, breakout spaces and a screening lounge space.
Proposal for interior alterations for new restaurant with universal washroom.
HVAC - Proposal for interior alterations for new restaurant with universal washroom.
Page numbers are hidden until the total count is available from the data service.