Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Structural Fire Damage Restoration.
Proposal for a party wall administrative permit for work occurring at 459 Manor Rd E.
HVAC - Proposal for three storey single family dwelling with rear covered porch, front porch, integral garage, cabana and in ground pool.
Revision 01: Revised areas are bubbled in drawings. HVAC - PROPOSED 2 STOREY SINGLE FAMILY DWELLING
Revision 1: modify the existing front porch.Existing Basement Foundation Underpinning and Basement Walkout Modification.
Demolition of existing dwelling and construction of a new two storey, two unit dwelling with attached garage.
Drain - Demolition of existing dwelling and construction of a new two storey, two unit dwelling with attached garage.
Plumbing - Demolition of existing dwelling and construction of a new two storey, two unit dwelling with attached garage.
REV 02: The ductwork on all floors has been revised based on the updated interior design.The ductwork layout and equipment serving the secondary unit have also been revised.REV HVAC - The ductwork …
REVISION-02Revision 1: Plumbing - To construct a new 3-storey 4 Unit -Detached dwelling with1 basement walkout, 1 porch, and 2 balconies
Revision 01 - Revision to roof design.-------------------------------------------------Proposal to demolish the existing single family dwelling and construct a new two storey single family dwelling…
Proposal for interior alterations to basement.
Proposal for a pergola and rear yard deck
Sunnybrook Health Sciences Centre Emergency Department Renovations.
HVAC - Sunnybrook Health Sciences Centre Emergency Department Renovations.
Plumbing - Sunnybrook Health Sciences Centre Emergency Department Renovations.
REVISION-02REV 01: Revision to roof design, ceiling height and structure.To construct a new 3-storey 4 Unit -Detached dwelling with1 basement walkout, 1 porch, and 2 balconies
REVISION-02Revision 1: HVAC - To construct a new 3-storey 4 Unit -Detached dwelling with1 basement walkout, 1 porch, and 2 balconies
Page numbers are hidden until the total count is available from the data service.