29 PRINCE ARTHUR AVE
REVISION 2- add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroo…
Showing first 15 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 2- add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroo…
REVISION - add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom…
REVISION - add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom…
Rev 01: proposal to waive the requirement for ground floor over a crawl space to be fire rated.Interior alterations and 4-storey rear addition to existing 3-storey building.
Proposed alternative solution to fire seporation for roof top terrace walkable skylight.
Alternative Solution for sprinkler Protected Glazing:Based on the limiting distance 79.74% to 80.69% of the area is required to have a fire resistance rating of not less than 1 h and is proposed to…
Alternative Solution for Exiting and Barrier free Access:ExitingThe minimum clear width required for exterior passageway is required to be 1100 mm and OBC 3.4.1.2.(2) highlights that exits are perm…
It is proposed to address the interconnected openings not more than 20 m2 between second and third floor levels of the building. In addition, it proposes the use of smoke baffles with closely space…
The 29-31 Prince Arthur Avenue building will be provided with a standpipe system. In lieu of required fire hose stations, it is proposed to install 65 mm fire hose valve connections within the exit…
HVAC - Interior alterations and 4-storey rear addition to existing 3-storey building.
Plumbing - Interior alterations and 4-storey rear addition to existing 3-storey building.
Drain - Interior alterations and 4-storey rear addition to existing 3-storey building.
Interior alterations and 4-storey rear addition to existing 3-storey building.
Drain - Interior alterations and 4-storey rear addition to existing 3-storey building.
Proposal for interior alterations and a 4 storey addition at the rear of an existing 3 storey office building. Address is 29-31 Prince Arthur Ave.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.