300 HUMBER COLLEGE BLVD
Mechanical equipment (intake and exhaust louvre) upgrade for the existing fire pump room. This work is part of an existing permit #26 118663 FSU 00 FS
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Mechanical equipment (intake and exhaust louvre) upgrade for the existing fire pump room. This work is part of an existing permit #26 118663 FSU 00 FS
Widening of an existing drain in the existing fire pump room to accommodate more drain pipes. No proposed below grade works. This work is part of an existing permit #26 118663 FSU 00 FS.
The designer's work is limited to providing sprinkler and fire alarm engineering design upgrade throughout including diesel fire pump assembly.
Revision 1: Changes include modification of wall layout and changing the elevation of the mezzanine.HVAC - Proposed new wash bay at 300 humber college blvd bakery
Proposal for a new exterior covered walkway along north side of building.
FS - Sprinkler Shop Drawing - Proposal to renovate existing wash bay
Revision 01: Changes include modification of wall layout and changing the elevation of the mezzanie. Proposed new wash bay to food manufacturing plant
Revision 01: A summery of changes are as follows: "Flour bin platform" renamed to "dispensing bowl platform and has changed locations as well as design changes, addition of platform within blower r…
Plumbing - Proposal to renovate existing wash bay
Revision 01: A summery of changes are as follows: "Flour bin platform" renamed to "dispensing bowl platform and has changed locations as well as design changes, addition of platform within blower r…
HVAC - Proposal to renovate existing wash bay
Proposal to renovate existing wash bay
Revision 01: Changes include modification of wall layout and platform. Added 1 new platform to the scope of work. Construct a new hygienic separation wall between raw and cooked goods- bakery - Giv…
Proposed Alternative Solution is to use a fixed ladder in order to access a service platform where electrical equipment is placed, rather than a stair as required in OBC Notice from March 11, 2024.…
Revision 01 - Raw washbay ceiling has changed from IMP panel to concrete, addition of 3 total roof platforms, removed monorail from exterior stair, revisions to the raw/RTE separation wall, additio…
Installation of free-standing storage rack system
FS - Sprinkler Shop Drawing - Proposed new wash bay to food manufacturing plant
HVAC - Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.
Plumbing - Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.
Proposal for interior alterations that include a new food processing line, new wash bays, separation walls and warehouse.
Page numbers are hidden until the total count is available from the data service.