43 HANNA AVE
The current unit (411) comprises two independent units (411 & 410 according to the original building construction plans) with two separate entrances and all the necessary utilities and amenities th…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
The current unit (411) comprises two independent units (411 & 410 according to the original building construction plans) with two separate entrances and all the necessary utilities and amenities th…
HVAC - Interior alterations to existing residential condo unit on the 5th floor. Unit 511.
Plumbing - Interior alterations to existing residential condo unit on the 5th floor. Unit 511.
Interior alterations to existing residential condo unit on the 5th floor. Unit 511.
HVAC - To complete interior alterations to suite 423 of the existing condo building (TSCC 1978 Reg in 2008) by creating two new live/work units and building out three live/work units.
To complete interior alterations to suite 423 of the existing condo building (TSCC 1978 Registered in 2008) for 5 live/work units. see zzc 13 108704See CofA Decision A0318/13TEY
Plumbing - To complete interior alterations to suite 423 of the existing condo building (TSCC 1978 Reg in 2008) by creating two new live/work units and building out three live/work units.
Proposal for interior alterations to existing office (decor suite) 24 and 38 on the fourth floor. See also 10 298186 BLD.
Revise fire proofing for 4th floor from drywall cladding to mineral fibre spray.
Revision to window sprinklers to NE corner Component ' C ' gf to 7th.Install sprinklers.
Revision to bathroom exhaust.
Revision to add 2 fixtures: 1 water closet, 1 wash basin.
Revision to building permit - see list of items revised.BIN 2134
Install sprinklers.
Plumbing - Interior alterations to fit out existing vacant space to a restaurant/cafe 59 Persons. Exterior woork being done by Building Developer.
Plumbing - Make interior alterations and construct a 3-storey addition over existing 5-storey building and a 6-storey rear addition and convert to residential and offices. - Interior Alterations
HVAC - Make interior alterations and construct a 3-storey addition over existing 5-storey building and a 6-storey rear addition and convert to residential and offices. - Interior Alterations
Make interior alterations and construct a 3-storey addition over existing 5-storey building and a 6-storey rear addition and convert to residential and offices. BIN 2079
Plumbing - Make interior alters for future sales office (for new condo) - Interior Alterations
HVAC - Make interior alters for future sales office (for new condo) - Interior Alterations
Page numbers are hidden until the total count is available from the data service.