555 UNIVERSITY AVE
REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(…
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(…
REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(…
Proposal for SickKids - Interventional Radiology Suite
Plumbing - Proposal for SickKids - Interventional Radiology Suite
This project consists of designing and installing sprinklers to fit interior renovations in an existing building on main level, this renovations will happen in two phases. Phase 1 rooms: M610, M612…
HVAC - Proposal for SickKids - Interventional Radiology Suite
FS - Sprinkler Shop Drawing - Sickkids Hospital - Interior Renovation from an office area on the 2nd floor to a new CT room, control room and AHU room.
Sickkids Hospital - Interior renovation to replace three existing doors.
HVAC - Sickkids Hospital - Interior renovation to replace three existing doors and replace the existing revolving door with a security entry gate.
Plumbing - Proposed partial renovations to the Diagnostic Imaging Department to allow for the installation of new imaging equipment.
HVAC - Proposed partial renovations to the Diagnostic Imaging Department to allow for the installation of new imaging equipment.
Proposed partial renovations to the Diagnostic Imaging Department to allow for the installation of new imaging equipment.
HVAC - Proposal for interior alterations, install 3 additional AHUs
Plumbing - Proposal for interior alterations, install 3 additional AHUs
Proposal for interior alterations, install 3 additional AHUs
Revision 1: Interior renovationHVAC - Proposal for Interior Renovation OR Room O at Sickkids Hospital.
Proposal: this project forms phase 1 of a complete fire alarm upgrade planned for the building. Phase 1 involves upgrading the obsolete and end of life Tyco-Simplex "4100U" head end equipment to th…
Revision 01: revision to door size to one of the doors from a 36" door to a 42" door and hardware Proposal for Interior renovation - Door addition and replacement and to install 2 new maglocks
Proposal to modify an existing sprinkler system to accommodate new mechanical equipment in different areas of the building: 3rd level north mechanical room, 9th level north mechanical room upper, 9…
Proposal for new MAGLOCK on door S783 to support permit # 25 136533 BLD 00 BA.
Updated Nov 21, 2026