168 CLONMORE DR
Rev 01: revised garbage chute drawings - A014, A015, and A754.construct 121 stacked townhouses in 7 blocks, BLOCK A
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01: revised garbage chute drawings - A014, A015, and A754.construct 121 stacked townhouses in 7 blocks, BLOCK A
REV HVAC - Revision to permit 19 216135 HVA 01 MS( 168-184 Clonmore Dr Block A) including revised Mechanical Drawings M501A, M502A & M503A for the revised HVAC routing
REV HVAC - Revision to Permit 19 216141 HVA 00 MS (168-184 Clonmore Dr Block B) including revised mechanical drawing M501B, M502B and M503B for the revised HVAC routing.
REVISION - Amendment to Permit 19 216148 HVA 00 MS (168-184 CLONMORE DR BLOCK F) including revised Mechanical Drawing M501 and M516 for the revised HVAC routing for basement residential units.HVAC …
REVISION - Amendment to Permit 19 216135 HVA 00 MS (168-184 CLONMORE DR BLOCK A) including revised Mechanical Drawing M501 and M516 for the revised HVAC routing for basement residential unitsHVAC -…
REVISION - Amendment to Permit 19 216141 HVA 00 MS (168-184 CLONMORE DR BLOCK B) including revised Mechanical Drawing M501 and M516 for the revised HVAC routing for basement residential units.HVAC …
REVISION - Amendment to Permit 19 216149 HVA 00 MS (168-184 CLONMORE DR BLOCK G) including revised Mechanical Drawing M501 and M516 for the revised HVAC routing for basement residential units.HVAC …
Proposal consists of minor changes to the permitted stacked townhouse development. Changes are required to the setbacks as the building envelope of all seven blocks has been pushed out by about 50 …
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK G
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK F
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK C
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK A
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK B with below grade garbage room
Plumbing - construct 121 stacked townhouses in 7 blocks, BLOCK D
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK D
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK A
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK B with below grade garbage room
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK G
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK C
HVAC - construct 121 stacked townhouses in 7 blocks, BLOCK F